Tuesday, December 31, 2019

The Fourth Extinction By Elizabeth Kolbert - 1477 Words

On a day to day basis most people take for granite the lives we get to live, along with putting to much value on the extra things such as materialistic items. Also, the majority of humans are too invested in their personal lives or with themselves that they do not look at the big picture of how what we are doing now will effect us later. As humans are routines in our lives can bring us harm, and within time a we may become the sixth extinction. I believe we threaten human existence as a species and it can eventually lead to destroying our own comfortable lives we have created for ourselves. In the beginning of the book â€Å"The Sixth Extinction† by Elizabeth Kolbert, she mentions a species of a frog that is going extinct because of a fungus that has been brought over by humans and has been spread around by water. It is attention-grabbing for the majority of people to find out what is happening to these frogs and for people who share an interest with frogs it is concerning. Ei ther its interesting or concerning it is important to know how these fogs are dying if humans seem to not be bringing harm to them on purpose, most would assume the fungus occurred naturally. However, in the book Kolbert mentions â€Å"Without being loaded by someone onto a boat or a plane, it would have been impossible for a frog carrying Bd to get from Africa to Australia or from North America to Europe† (Kolbert 18). Since Humans have altered the way we live and it is constantly changing it was only a matterShow MoreRelatedThe Fourth Extinction : An Unnatural History By Elizabeth Kolbert1112 Words   |  5 Pagesfive major mass extinction on earth triggered by a distinguishable event, but in The Sixth Extinction: An Unnatural History, Elizabeth Kolbert writes of the narrative of the sixth extinction caused directly by human impact. The book identifies the effects of human activity on how, over humans history on earth, the natural world has been affected. Every environmen tal impact stems into three basic groups of global problems to nature: Pollution, Habitat loss and Invasive Species. Kolbert explains thatRead MoreOne Significant Change That Has Occurred in the World Between 1900 and 2005. Explain the Impact This Change Has Made on Our Lives and Why It Is an Important Change.163893 Words   |  656 Pages7 percent. The more-developed countries of Asia (Japan, Hong Kong, Singapore, and, in smaller numbers, South Korea and Taiwan) account for 4 percent and 6 percent if Israel is added. And so-called south-to-south migrations make up the remaining fourth (see table 1.4). 36 †¢ CHAPTER 1 TABLE 1.4: PLACE OF RESIDENCE OF INTERNATIONAL MIGRANTS IN 2005 Region or Country Number % of Total Northwestern Southern Europe 41,737,698 22 United States 38,354,709 20

Monday, December 23, 2019

Essay on Religion and Morality in Hamlet - 955 Words

Benny Woo 10/27/10 Religion and Morality in Hamlet In William Shakespeare’s Hamlet, the Danish prince sets out to avenge his father’s assassination at the hands of his uncle Claudius, the new king. At first, Hamlet is fragile because of his father’s sudden death and the following marriage of his mother Gertrude and uncle Claudius. Originally contemplating suicide, Hamlet dissuades himself from doing so on the grounds of it being a sin. Shifting from an internal struggle to an external one after he meets his father’s spirit, he seeks to kill Claudius but cannot due to his religion again. Finally Hamlet thwarts Claudius’ plans to be assassinated in England and returns to Denmark. He finds peace in his Christian faith before dying in†¦show more content†¦Then Hamlet’s self-involved thoughts of suicide transform into homicide. Again his religion delays the crime. He confirms his uncle’s guilt after staging a play that mimicked the supposed manner of his father’s assassinat ion. Hamlet then sneaks up on Claudius with a sword and has the first opportunity to exact his vengeance. However the prince overhears his uncle confess â€Å"Oh, my offense is rank! It smells to heaven. It hath the primal eldest curse upon’t, a brother’s murder† (3.3. 36-8). Claudius’ reference to â€Å"heaven† and the â€Å"primal eldest curse†, the story of Cain and Abel, connects importance of religion in morality. His guilt invokes biblical images and so Claudius realizes the â€Å"rankness† of his actions. The mutual valuation of religion in turn saves Claudius as Hamlet almost kills him. Hamlet says â€Å"Now might I do it pat, now ‘a is a-praying; And now I’ll do’t. And so ‘a goes to heaven† (3.3. 73-5). Hamlet considers that Claudius is praying, a holy act, so he resists executing him in the fear he â€Å"goes to heaven†. Although he literally does not want to inadvertently reward Claud ius, Hamlet observes that his usurper uncle shows remorse and says â€Å"And am I then revenged, to take him in the purging of his soul, when he is fit and seasoned for his passage?† (3.3.84-6). In deeming his uncle â€Å"fit and seasoned for his passage†, that is to be killed at another time, Hamlet does plan onShow MoreRelatedWilliam Shakespeare s Hamlet - Morality And Religion1442 Words   |  6 PagesMorality Religion in â€Å"Hamlet† In William Shakespeare’s â€Å"Hamlet,† the prince of Denmark embarks on a quest of revenge against his Uncle Claudius, the new king, for the assassination of his father. In the beginning, Hamlet was contemplating suicide with the news of his father’s sudden death and the quick marriage of his mother, Gertrude and Uncle Claudius, but decides not to by virtue of being a sin. In the play â€Å"Hamlet,† Shakespeare examines the role of suicide in morality and religion providingRead MoreAnti-Idealism In Shakespeares Hamlet1563 Words   |  7 Pagesalso were very influential in encouraging the anti-ideal sentiment. However, while many of Shakespeare’s plays do portray this anti-idealism, one exception to this is Shakespeare’s play Hamlet. While Hamlet does express ideas such as skepticism and contempt, particularly through Horatio’s character, it also uses religion as a driving force behind character motivations, exemplifies the ideal of c ontemplation, and also demonstrates the heroic ideal through Hamlet’s character. Moreover, while one of theRead MoreLaertes And Hamlet Foils In Shakespeares Hamlet958 Words   |  4 Pagesand characteristics. In Shakespeare’s Hamlet, Laertes serves as a foil for Hamlet in which their contrast presents pivotal themes that reveal Hamlet’s character. While the play has many themes, morality, revenge, and honor specifically relate to the contrast between Laertes and Hamlet, consequently resulting in Laertes purpose as a foil for Hamlet. Hamlet’s religion shapes his view on morality, ultimately guiding many of his actions regarding death. Hamlet is a afraid of life after death as demonstratedRead MoreInternal Conflict And External Conflict In Shakespeares Hamlet711 Words   |  3 Pagesdramatic work. In William Shakespeare’s Hamlet, the protagonist, Hamlet, exhibits certain responses to external conflicts, which provoke internal conflicts and assert his character. The central inward conflict and the principal motive that this character experience is the delay in his revenge against Claudius which is caused by his conscience. The mental and emotional complications experienced by him throughout the play shape the events that occur. Hamlet battles his inner soul and supresses hisRead MoreHamlet, By William Shakespeare Essay1453 Words   |  6 PagesHamlet by William Shakespeare explores many aspects of mankind--death, betrayal, love, and mourning. Out of these, the most prominent theme in this play is death in the form of suicide. The main character, Hamlet, finds himself questioning the quality of life and the uncertainty of the afterlife once he discovers news of his father s death and the corruption in the kingdom that follows. Ophelia, Hamlet’s lover, is found dead later in the plot and is presumed to have committed suicide. In Hamlet’sRead MoreEssay about Suicide in Hamlet1448 Words   |  6 PagesIn Shakespeare’s Hamlet, suicide is treated differently on the aspects of religion, morals, and philosophical views. Suicide is the act of deliberately killing yourself in contrary to your own best interests. In today’s society suicide is highly looked down upon. But Shakespeare used suicide and violence in almost all of his most popular plays. Many of his tragedies used the element of suicide, some accomplished, others merely contemplated. Shakespeare used suicide as a dramatic device. A character’sRead MoreTo Kill a Mockingbird by Harper Lee1185 Words   |  5 Pagesracial discrimination is prominent. Hamlet is a tragic play, written about the sixteenth and seventeenth centuries, involving incest, murder, and dishonesty. The above literatures are written during different periods of time and are contrastive in numerous aspects. However, both literatures ar e comprised of numerous scenes where the main characters deal with situations that test their morality and values. Atticus Finch in To Kill a Mockingbird and Hamlet in Hamlet, are asked to determine the fate ofRead MoreWilliam Shakespeare s Hamlet Essay902 Words   |  4 Pagesthe drama, â€Å"Hamlet†, which is one of the most famous tragedy in the literature written by William Shakespeare between from 1599 to1602. The drama was written at the age of Renaissance that reflects the reality of the British society in sixteenth century to early seventeenth century. During that period, Britain was in the era of reverse confusion, and Hamlet is just about the epitome of this era. The tragic play happened in Kingdom of Denmark dramatizes the revenge that Prince Hamlet intended toRead MoreA Treatise Of Human Nature1562 Words   |  7 Pagesdetermines that morality is a character trait approved independently of social conventions. He goes on to conclude that morals cannot be derive d from reason when reason is inert, and can neither prevent nor produce action or affection. Hamlet (1602), Frankenstein (1823) and The Picture of Dorian Gray (1891) are all consumed by the innate passion that Hume defines as ‘morality’, yet pivot around the social conventions of their respective eras, broadly identified as ‘reason’. While Hamlet is embodied byRead MoreChristian Beliefs Of Shakespeare s The Movie Of The Play 956 Words   |  4 Pagesother feature contrasting in the movie to the play are certain themes that surround religion. The biggest factor that altered the religious ardor seen within the play is the change of setting. Instead of using religion to play a major role to develop the film, Almereyda incorporated more modern traits in the film, such as technology and color. There is not much of the religious influence as was seen in the play. Religion played a major role in the development of the play and seeing that it is completely

Sunday, December 15, 2019

Vermont Teddy Bear Free Essays

As a good marketing strategy, it would be wise for Vermont teddy Bear to penetrate at least the distribution channels of various toy stores. Therefore as a suggestion, the company should at least create a special â€Å"manufacturer-to-dealer† program which will be initiated and targeted towards the specialty and toy store businesses operating today. In this notion, it is recommended also to Vermont that it sets up a special discount program offer in its website which will be geared towards potential visitors who are willing to be distributors of the company’s products. We will write a custom essay sample on Vermont Teddy Bear or any similar topic only for you Order Now Basically, the rationale for this suggestion comes in the aspect of attaining more exposure or advertising mileage without themed to add more mediums of advertising. Acquiring a list of specialty stores which are willing to distribute and resell the teddy bear products can help Vermont Teddy Bears to save money. Also, this will widen the market segment of the company since people are not actually invoiced to look for toys online as the primary channel but to go to a toy store which can provide both visual and tangible aspects of product presentation. Moreover, the establishment of special product discounts for wholesalers can increase the web traffic of Vermont because it will not only concentrate on individual clients but to corporate customers as well. When it comes to the demands of the target market, the creation of additional channel for distributorship certainly meets this aspect. Ordinary people can purchase their teddy bears online while wholesale customers or distributors can also manage to acquire more information on how they will profit from partnering with Vermont as a manufacturer. How to cite Vermont Teddy Bear, Papers

Friday, December 6, 2019

Risk Management Global Engineering Project Managment

Questions: Task 1 Each short answer question requires a response in few sentences. 1. What are the core principles/characteristic of any project and why are they important? 2. How would you have defined the scope of the project in the task 2 case study (concrete masonry corporation) 3. Using the information below, plot out full project Gantt chart and identify the critical path? How many days does it take to complete the project? What are the benefits of using the Gantt chart? 4. Define on of the following cost appraisal methods: NPV, payback or IRR. What are the benefits of you chosen method? 5. How would you have assessed and managed the risks on the project in the task 2; case study (concrete masonry corporation) 6. What quality methods (project evaluation, monitoring and quality control) would you introduce to ensure this task2; project (concrete masonry corporation) is completed successfully. Tasks Time 3 days 5 days 6 days 2 days 6 days 8 days 3 days Task 2: The Concrete Masonry Corporation designs and manufactures pre-stressed concrete for the building industry. For years, the company enjoyed a stable marketplace, and a relatively predictable business environment. Although there had been a boom in residential construction in recent years, commercial work was on the decline. As a result, all the pre-stressed concrete manufacturers were going farther afield to big jobs. In order to survive, Concrete Masonry Corporation was forced to bid on jobs previously thought to be out of their geographical area. Survival depended upon staying competitive. However with the declining conditions of the market and the evolution that had drastically changed the character of the market place, the Concrete Masonry Corporation previously successful approach was now in question. With the removal of trade barriers and other globalized international trade agreements the Concrete Masonry Corporation found itself competing with other pre stressed manufacturers he adquartered in countries around the world. A decision was then made to transfer a number of manufacturing machines to a new site in Eastern Europe to allow more agility and efficiency within their manufacturing supply. Answers: Task 1 Significance and core principles of the project The project management provide the knowledge and understanding of conducting a project successfully in order to achieve the project objectives. The project deliverables are innovatively coordinated and executed by the project manager with the help of innovative project management tools (Agrawal, 2009). It is imperative to have a reliable project planning that will assist to conduct each activity in a pioneering way. Therefore, the effective planning guidance and extraordinary project managing capabilities are established. However, making transfer to the new target market and increasing the efficiency of production rate is innovatively done by the project manger by arranging the machineries and equipments in an effective way that will provide the maximum output. Scope of the project Project scope management consists of several components such as initiation of the project and in this phase the reliable planning and preliminary design of the framework is conducted. After that the scope of planning consists of the valuable output of the project in future. The defining of scope includes the delivery of project objectives to the members of development members (Atesmen, 2008). Finally, the scope verification and scope change control also coordinated and managed by the project manager. Gantt chart, critical path and benefits of using Gantt chart Project Activities Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Preliminary planning Resources allocation Cost and budgeting Hiring innovative project team Implementation of innovative strategies and ideas Development of innovative framework Traffic management Road maintenance Material handling measures implementation Implementation of quality management tools Appropriate arrangement of machineries and equipments Enhancement of product delivery system Finalising the project Gantt chart helps in identifying each activity with the time. Therefore, the primary benefit of using Gantt chart is that the risk of time overrun is eliminated after implementing this particular approach (Bennett, 2003). Critical path NPV, payback or IRR and benefits of the chosen method Net present value, internal rate of return and Payback period are the investment appraisal techniques which help to provide the management to take effective decision regarding the company taking investment techniques.Net present value is considered to be one of the most effective time value which help the company to take investment proposal techniques. Net present value of the company is considered to be one of the effective and accurate information regarding the company. Payback period is considered to be one of the simple and basic investment appraisal techniques which help the company to determine the number of year which are required to complete the project for the given period of time. Internal rate of return help to give the company accurate and reliable information as it also take the time value of the money into its which help the company to take effective decision elated to the company investment project related to the company. The best and accurate information help to take the effective decision related company investment project option. Risk management The risk rating tools and probability of risks are illustrated below Risk Event Probability Analysis Rating 0 - 0.07 It will not happen for sure Low 0.28- 0.45 Less chance of incidence Low 0.51 - 0.56 least chances Medium 0.58 - 0.61 More than one chance to arise Medium 0.72 - 0.81 May be occur High 0.90 - 1 Higher chance of incidence High Risk Analysis Worksheet (RAW) Prioritize Risks Risk ID Impact Score Impact Rating Risk Score Risk Priority Rating Risk Priority Ranking 01 0.65 reasonable 0.71 Short 2nd 02 0.89 small 0.52 Medium 3rd 03 1 elevated 0.26 Long 1st Project method, monitoring, and quality control The effective methods and monitoring is conducted by the project manager and most importantly the reliable and extraordinary tools are implemented by the project managers that help in conducting the project successfully. On the other hand, the appropriate quality management tools are implemented that helps in conducting the entire project successfully (Blokdijk, 2007). Task 2 Introduction The concrete Masonry Corporation primarily produce concrete for building industries and in recent times the residential construction business is going through a critical condition and for this particular purpose the company decided to further expansion of their market place in other geographical region (Bukchin and Rozenes, 2011). Therefore, a new site in Eastern Europe is managed by the company and as the huge demand of condition work is present the company will be able to make an excellent knock in business operation. In this particular context, several machineries and equipments will be transferred through sea transportation and after that the equipments will be delivered to the new unit via road transportation. The innovative monitoring and supervision is provided by the project manager that helps in conducting the entire project successfully. On the other hand, the manufacturing department efficiency will be increased with the help of innovative leadership quality provided by th e company as well as the product qualities are also maintained through total quality management tools. The reliable framework is developed by the project manager that helps in executing the entire activities in an innovative way and the efficient team is present therefore the activities will be conducted as per the developed plan. However, the skills and knowledge of project manager plays an important role in overall project and in this particular context the reliable knowledge and understanding of work is present in project manager (CHEN and WEN, 2010). The reliable budget is provided by the company 900,000 pounds and the desired time frame of 6 months are also given that helps in conducting each stage successfully. Project life cycle and quality maintenance approach are also illustrated in this particular context and effective communication tools are also implemented that helps in providing the best possible understanding of ongoing task to the members and therefore the desired ou tput is achieved by the development team (Consoli, 2006). Project planning In this particular context, the project manager plays an important role because the entire development framework is executed and developed by the project manager. The daily reports are also taken from the ongoing work that provides a clear and precise idea about the working process (Costa, 2003). First of all, the planning documents are forwarded to the site engineer and the proper understanding is provided to the members it helps in executing the transfers of each equipments and machineries in an innovative way. The project goal and objectives are established and the transportation cost is become one of the most critical components which is managed by the project managers innovatively (Crawford, French and Lloyd-Walker, 2013). After that, the reliable quality management tools are implemented by the project manager that helps in proper handling of machineries and equipments. After the dispatch of material to the Eastern Europe the road transportation is used by the project manager to deliver the materials to the project site. During the delivery system the machinery and equipments are fitted on the specified that that will help in increasing the overall output of production and therefore the company will be able to generate the reliable revenue from the market. Furthermore, it can be stated that the ensure process of project execution to finalisation framework is developed in planning section that provide immense impact in overall project (Crouhy, Galai and Mark, 2000). Most importantly, in t his particular context the reliable measures and innovative tools and techniques are implemented by the development team members. Cost control Cost control is one of the most critical components and it provide critical impact on overall project, On the other hand, the reliable profitability from the target market is achieved by the company because the functional areas development is innovatively conducted by the management department that help to create a competitive advantage in the market (Cullar-Franca and Azapagic, 2013). The extraordinary cost management is done with the help of effective tools and techniques and they are as follows. Cost estimating The cost estimating is innovatively done by the project manager because each activity stage cots is sub divided and the best possible estimation is done including the transportation cost, operating cost and development cost (Eskerod and Blichfeldt, 2005). Cost accounting Cost accounting is innovatively done by the project manager because a separate accounting department is developed by the project manager that helps in better monitoring of financial assets because as per the requirement the reliable financial funding is provided by the accounting team (Heerkens, 2006). Project and company cash flow The cash flow of cash stage is calculated innovatively by the project manager and most importantly the reliable contribution is provided by the accounting department to showcase the project cost and company cash flow is analysed by the management department and functional area development is conducted after conducting cash flow analysis (Holm et al., 2013). Most importantly, cash flow analysis help to understand the project process development because each stage of cash flow is analysed in comparison to the output provided by the particular activity. Direct labour cost and overhead costing The labour costing is one of the most significant components that provide immense impact on overall costing. The human resource costing is innovatively arranged and as per the roles and responsibilities of the project the reliable compensation are provided accordingly. Execution of the project The appropriate execution must be done as per the requirement of the project and in this particular context project plan is innovatively carried out. On the other hand, the scope verification is conducted and therefore the adequate amount of knowledge and responsibilities of individuals managers is illustrated with the help of this particular approach (Holmes, 2002). After that the quality assurance is conducted that helps indentifying the overall project performance and most importantly, it become clear that all the quality standards are innovatively maintained by the development members. Team development is one of the most significant stages that provide immense significance on overall project five members team were present previously and as because it is a huge transferring project the adequate team members were selected to make the project successfully in terms of sustainability and reliability. Information distribution is also conducted because the reliable information are avail able and therefore the reliable supply of construction material were delivered within the given time schedule (Jeswani, Smith and Azapagic, 2012). Resource allocation is significantly done after understanding the exact requirements of the project and in this particular context the reliable resource allocation and suitable administration is done by the project manager that results in achieving desired output of the project. Models of project management The project management maturity model (PMMM) is implemented in this particular context that helps in increasing the reliability and accuracy of the project because the model consist of five stages and most importantly all these levels provide different degree of maturity in this particular project (Kehl et al., 2001). However, this particular framework helps in executing the overall project in systematic manner. Figure- Project management maturity model The above model provides enormous contribution to the project because each stage helps in conducting the developed framework in best possible way. The suitable language terminology is used in this particular context that help in providing each stage of knowledge to the development team. Therefore, the overall output of the project is achieved and as per the established objectives the reliable work is conducted by the development members (Kerzner, 2013). The suitable project management principles are used in this particular project the basic knowledge of project management helps each individual to conduct their roles and responsibilities in an innovative way with the help of simplified methodology of continuous development. The modern and advance technological tools are implemented by the project manager that helps in increasing accuracy of the project as well as help in conducting each stage of activities with great zeal and affection. The machinery and equipment transfer should be d one with proper care because any kind of damage can results in huge financial loss of the company (Kerzner, 2011). The process improvement is conducted after the evaluation of performance of each stage and it help in reducing the chances of cost overrun and delivery delay. Furthermore, it can be stated that the five levels of maturity model helps in monitoring each stage of the project in an innovative way. The final level of project management maturity model helps in increasing the level of conducting the project and thus the continuous improvement results in achieving the successful results of the project and the products are delivered to the customers as per their requirement within the delivery time process previously by the company (Kloppenborg, Tesch and Manolis, 2014). Project Integration Time management Time is one of the most valuable components of project management and it must be managed innovatively by the project manager and each day report is taken from the service engineer regarding the transfer and most importantly after the dispatch the reliable road transportation system is observed and the required time is calculated and as per the time taken by the road transportation the dispatch is conducted from the old site. After that the manufacturing unit development is conducted (Krause, 2006). The each activities time is properly maintained by the development members. Cost management Cost management is one of the most critical components that provide immense impact on overall project and in this particular context the reliable precautions and measure are undertaken by project manager such as cost estimation, budgeting and cash flow analysis. The cost management tools helps in eliminating the chances of cost overrun and it help the project development team to increase their reputation by providing extraordinary work to the company (Lawson, Wearne and Iles-Smith, 1999). With the help of effective cost management the project goal and objectives are achieved. With the help of cost estimation process each activities stags cost is analysed and after that the total cost is compared with the estimated budget provide by the company. Cost control techniques are implemented by the project management team because it helps in providing the reliable cost for the activities to be conducted to make the project successful in terms of quality and reliability. Accounting department is developed by the project manager to supervise make effective control in cost management. Quality management The total quality management tools are implemented by the project manager because the business of the company is going globally and to make competitive advantage in the market the reliable quality management tools are implemented such as ISO 9000 (Westland, 2006). The supply chain management system is enhanced after the development of the enhanced manufacturing system the machineries and equipments are placed in an innovative way that results in increasing the productivity of the company (Mills, 2013). Most importantly, with the help of quality management tools the service quality is become higher and it helps to enhance the service and facilities of the company. There are some regulatory regulations are present that must be maintained by the development team as well as the company because the product quality enhancement will help to attract the customers in an innovative way and in transferring of the materials the reliable precaution and measures are undertaken with the help of qua lity tools. Communications There are some extraordinary communications channels are use in this particular project. It is important to communicate with all the stakeholders included in the project that will help to provide better understanding of project goals and objectives (Portman, 2009). In this particular context, the reliable communication with the road transportation authority of Eastern Europe is conducted because after the machineries and equipments are delivered to the port and after that the road transporting is utilised. The walky talky is used by the stakeholders to communicate regarding any kind of activities because the proper understanding of project actuates must be provided to the team members and it will enhance the service quality. Simultaneously, the expectation of the company will be fulfilled because with the help of effective communication the product delivery system of new unit will be increased. However, the advance technological applications are utilised by the project managers to co mmunicate with the members while conducting the transfer from one site to another. Furthermore, it can be stated that the effective communication provide several advantages to this particular product as well as help in eliminating type miscommunication issues and results in achieving the desired output of the project (Wallbridge, Banford and Azapagic, 2012). Risk management Risk management is one of the most critical components that provide immense impact in overall project and in this particular context the risk migration strategies and techniques are applied by the project manager that helps in conducting the entire project innovatively. Each stages of project risk management are conducted by the project manager and it helps to complete the entire project successful. The member of development team safety is conducted by taking valuable measures and tools that ensure the safety of members of development team (Quenault, 2001). On the other hand, the equipments and machinery safety must be taken by the project and for this particular purpose the reliable precaution and advanced technological application are implemented to conduct the loading and unloading of material safety. The high weight capable engineers are involved to unloading and dispatch to the material to the cargoes loaded in the truck. Most importantly, the traffic management is innovatively done by the project manger because the new site is far away from the port and for this particular purpose the reliable road management and safety precautions applications are implemented (Roberts, 2011). However, a 20 members team of traffic management team is applied by the individuals that help in better trafficking system management that simultaneously help to reduce the rate of accidents during the dispatch of materials form the port to the new site because if any damage of occurs than it will provide critical impact on overall product and the company financial damage can hamper the business expansion process as well. Therefore, the valuable precautions and innovative supervision is done by the members to deliver the materials safely to the new site of the company. Leadership It is important to establish better coordination and monitoring between the members of development project because it helps in executing each activity of transportation, handling, and quality maintenance and safety management. In this particular context, the transactional leadership strategy is implemented by the members that help in increasing the confidence of the development members and on the other hand the reliable understanding of project objectives and goals are delivered to them by the leaders (Smith, 2007). Therefore, it is evident from this particular project that innovative leadership is one of the most imperative components of a particular project development because it helps in increasing the overall output of the company by increasing the efficiency of each development members. However, the critical situation handling and executing of critical tasks knowledge is mainly delivered by the members. Most importantly, the motivation and commitment of the employees are increas ed within the company because several policies and compensation and increment policies are launched by the company that helps in building a market reputation in new target market and employees retention is innovative done by the company. Role of project manager The project manager plays an important role in overall project and the each responsibilities of conducting the project is taken by the project manger and therefore the effective supervision and well skilled as well as experienced project manager is required to complete a project a successfully. The project goals and objectives are appropriately fulfilled and the established framework is properly recognised and implemented by the project manager Kevin Lewis (Turner and Tuason, 2010). He is one of the most key factor to make the project successfully without making any uncertain or unexpected loss of financial assets of the company because any kind of damage occurs in equipments and machineries then huge amount of financial loss may suffered by the company. Each stage of activity is critically analysed by the project manager and cost return are also analysed with the help of innovative software tools. However, it can be stated that the project managers provided enormous effort to make t he project successful in terms of reliability and financial feasibility is also present. Furthermore, the role of project manager is suitably maintained in this particular context of transferring the construction elements and development of enhanced manufacturing unit that will help to satisfy the needs and demands of the customers. Lifecycle of the project The effective life cycle approach is highly required to make the project successful in terms of quality and reliability and in this particular context of transferring the equipments and machineries of concrete masonry Corporation the suitable life cycle approach is undertaken that helps in understanding the needs of resources in functional areas and with the help of effective supervision and monitoring of project manager (van den Ende and van Marrewijk, 2014). Most importantly, project management cycle provide an innovative framework of conducting the entire project successfully and with the help of the innovative framework the project objectives are achieved. The life cycle of the project is starting from project initiation to project closure. During the stage of project initiatives the project charter is developed by the project manager that help in smooth running of the project because the roles and responsibilities of members and the proper understanding of project activities are delivered to the members of development team (Wysocki, 2004). Planning is one of the most critical conducted effectively and the desired framework is properly analysed by the project manager because the entire process is entirely dependent upon the planning. After that the execution of that developed planning is conducted innovatively with the help of advance technological application and software (Vanhoucke, 2012). After conducting each activity with great zeal and affection the desired output is achieved by the project and on the other hand the company is able to able a good knock in the new target market because the manufacturing department development is c onducted with the help of proper arrangements of supply chain system and product delivery system. However, the best possible tools and techniques are implemented to make the project successful in terms of quality and reliability. Conclusion The project provide a clear and concise idea about the concrete masonry corporation equipments and machinery transfer to the Eastern Europe to increase the profitability of the company and to make the project successful in terms of quality and financial reliability the innovative team is hired by the company (Walker and Loosemore, 2003). With the supervision of Kevin Lewis the project manager each activity is completed according the project objectives. Furthermore, it can be stated that the reliable risk migration strategy and extraordinary tools of project management is maintained by the project manager that results in making the project successful. References Agrawal, R. (2009).Risk management. Jaipur, India: ABD Publishers. Atesmen, M. (2008).Global engineering project managment [i.e. management]. Boca Raton: CRC Press. Bennett, F. (2003).The management of construction. Amsterdam: Butterworth/Heinemann. Blokdijk, G. (2007).Project management 100 success secrets. [Brisbane, Australia]: [Emereo]. Bukchin, Y. and Rozenes, S. (2011). A multi-objective approach for decision making during the project life cycle.IJPOM, 3(2), p.184. CHEN, D. and WEN, S. (2010). Systematic Management of Highway Project Life Cycle Cost.Management Engineering, pp.35-39. Consoli, G. (2006). Conflict and managing consortia in private prison projects in Australia Private prison operator responses.International Journal of Project Management, 24(1), pp.75-82. Costa, D. (2003).Health and labor force participation over the life cycle. Chicago: University of Chicago Press. Crawford, L., French, E. and Lloyd-Walker, B. (2013). From outpost to outback: project career paths in Australia.International Journal of Project Management, 31(8), pp.1175-1187. Crouhy, M., Galai, D. and Mark, R. (2000).Risk management. New York: McGraw Hill. Cullar-Franca, R. and Azapagic, A. (2013). Life cycle cost analysis of the UK housing stock.The International Journal of Life Cycle Assessment, 19(1), pp.174-193. Eskerod, P. and Blichfeldt, B. (2005). Managing team entrees and withdrawals during the project life cycle.International Journal of Project Management, 23(7), pp.495-503. Heerkens, G. (2006).The business-savvy project manager. New York: McGraw-Hill. Holm, D., Ritchie, L., Snyman, K. and Sunderland, C. (2013). Social impact management: a review of current practice in Queensland, Australia.Impact Assessment and Project Appraisal, 31(3), pp.214-219. Holmes, A. (2002).Risk management. Oxford, U.K.: Capstone Pub. Jeswani, H., Smith, R. and Azapagic, A. (2012). Energy from waste: carbon footprint of incineration and landfill biogas in the UK.The International Journal of Life Cycle Assessment, 18(1), pp.218-229. Kehl, J., Waring, B., Smith, R. and Nalder, D. (2001). Multiple Use Management Planning in Queensland, Australia: the Koombooloomba Ecotourism Project (a case study).Schweizerische Zeitschrift fur Forstwesen, 152(4), pp.123-128. Kerzner, H. (2011).Project management metrics, KPIs, and dashboards. Hoboken, N.J.: Wiley. Kerzner, H. (2013).Project management. Hoboken, New Jersey: John Wiley Sons, Inc. Kloppenborg, T., Tesch, D. and Manolis, C. (2014). Project Success and Executive Sponsor Behaviors: Empirical Life Cycle Stage Investigations.Project Management Journal, 45(1), pp.9-20. Krause, A. (2006).Risk management. Bradford, England: Emerald Group Pub. Lawson, G., Wearne, S. and Iles-Smith, P. (1999).Project management for the process industries. Rugby, Warwickshire, UK: Institution of Chemical Engineers. Mills, A. (2013). Construction cost performance of structural frames in Australia.IJPOM, 5(1/2), p.57. Portman, H. (2009).Prince2 in practice. Zaltbommel: Van Haren Pub. Quenault, H. (2001). VERS implementation project at the Department of Infrastructure Melbourne, Australia.Records Management Journal, 11(2), pp.71-82. Roberts, P. (2011).Effective project management. London, UK: Kogan Page. Smith, N. (2007).Engineering project management. Oxford, UK: Blackwell. Turner, P. and Tuason, S. (2010).Project Seahorse. Boston [Mass.]: Houghton Mifflin. van den Ende, L. and van Marrewijk, A. (2014). The ritualization of transitions in the project life cycle: A study of transition rituals in construction projects.International Journal of Project Management, 32(7), pp.1134-1145. Vanhoucke, M. (2012).Project Managment with Dynamic Scheduling. Berlin: Springer Berlin. Walker, D. and Loosemore, M. (2003). Flexible problem solving in construction projects on the National Museum of Australia project.Team Performance Management: An International Journal, 9(1/2), pp.5-15. Wallbridge, S., Banford, A. and Azapagic, A. (2012). Life cycle environmental impacts of decommissioning Magnox nuclear power plants in the UK.The International Journal of Life Cycle Assessment, 18(5), pp.990-1008. Westland, J. (2006).The project management life cycle. London: Kogan Page. Wysocki, R. (2004).Project management process improvement. Boston: Artech House.